Article 704. Performance by the contractor ' s dependants
1. Unless otherwise provided for in the contract, the work shall be performed by the contractor ' s identification, from its materials, its forces and means. 2. The contractor shall be liable for the inadequate quality of the pre-trial detention. The material and equipment he delivered, as well as the material and equipment that was subject to the rights of third parties.